Alexander Bahr

Hydromea’s LUMA wireless system provides real-time data during the installation of a wellhead foundation in a TOTAL drilling project

Hydromea’s LUMA, a wireless high-speed underwater communication system, was successfully deployed by Rever Offshore during an installation of a subsea wellhead foundation for Total drilling in the North Sea in February 2019. LUMA was integrated with Ashtead Technology’s AMS+ (Autonomous Monitoring System) as a primary data telemetry modem to allow real-time data to be sent topside and displayed on a…

Hydromea Reduces Risk and Improves Speed in a Subsea Manifold Installation

Hydromea’s LUMA, a wireless high-speed underwater communication system, was successfully deployed by a leading subsea operator, during a subsea manifold installation project in the North Sea in November 2018.  LUMA was integrated with Ashtead Technology’s AMS+ (Autonomous Monitoring System) to deliver fast and reliable remote communication of heading, pitch, roll and other essential data in real time via a work…

Start typing and press Enter to search

Shopping Cart

LUMA XLUMA100LUMA250LUMA500LUMA US power supplyLUMA EU power supplyLUMA power/data cable










×